    User name adaq

    Log entry time 00:00:45 on May 27, 2009

    Entry number 276707

    keyword=Beam Time Accounting
    Hall A

    05/26/09 1600-2400
    Experiment #: E05-102
    Shift Leader: William Tireman
    Shift Workers: John Watson (3rd), Yawei Zhang (target)

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.000.000.590.750.000.000.760.822.92
    Beam Available
    but Not in Use
    0.000.150.340.130.951.000.080.062.71
    Beam Not Available
    or Unacceptable
    1.000.850.070.120.050.000.150.122.36
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.001.001.001.000.000.001.001.006.00
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.000.000.001.001.000.000.002.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.001.001.000.000.002.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00
    Bbite0.000.000.000.000.000.000.000.000.00

    Comments: Took over from Day Shift after all day beam study. MCC is tuning beam to the switch yard and will contact once they are ready for Hall A tune up. Target is in the empty position. Beam restored at 1745 hrs. Beam on target checkout began production running at 1842 hrs 2000 hrs --- problem with Right HRS event taking. RC contacted and has arrived at ~2005 hrs. Experts on call have arrived and control access requested to look at Right HRS trigger supervisor cables Beam back at 2202 hrs after the correction of the T1 trigger cable.

    Data Entry by: William Tireman