Log entry time 16:11:41 on May27,2009
Entry number 276870
keyword=Day Shift Summary
0800: Took over from Owl Shift with 12 uA beam on target running on He-3 polarized target. Polarization check is now every 8 hrs and was ran at 0805 with 57.9% as the result. Restarted HAPPEX DAQ during polarization check; Run # 31428
0928: Switching to H2 Reference target.
0936: Beam back on H2 target
1000: New Happex Run started 31429
1014: Beam off to switch gases in the reference cell to N2
1021: Beam back on 12 uA with 10 psig of N2 in reference cell.
1034: Stopped N2 reference run 2815/21715 early since Left HRS DAQ was having issues (96% deadtime) EB1 not responding well.
1038: Restarted the Left HRS DAQ and back to N2 run.
1120: Requested beam off to switch back to He-3 target. Also had NMR sweep taken. Polarization is 56.4%.
1125: Beam is back at 11 uA per Doug H. request
1134: Started new HAPPEX run after the reference cell measurements
1249: Beam off for Moeller measurement
1515: Half wave plate is OUT.
1400: Moeller measurement still in progress at end of shift.