• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name tireman

    Log entry time 16:11:41 on May27,2009

    Entry number 276870

    keyword=Day Shift Summary

    0800: Took over from Owl Shift with 12 uA beam on target running on He-3 polarized target. Polarization check is now every 8 hrs and was ran at 0805 with 57.9% as the result. Restarted HAPPEX DAQ during polarization check; Run # 31428

    0928: Switching to H2 Reference target.

    0936: Beam back on H2 target

    1000: New Happex Run started 31429

    1014: Beam off to switch gases in the reference cell to N2

    1021: Beam back on 12 uA with 10 psig of N2 in reference cell.

    1034: Stopped N2 reference run 2815/21715 early since Left HRS DAQ was having issues (96% deadtime) EB1 not responding well.

    1038: Restarted the Left HRS DAQ and back to N2 run.

    1120: Requested beam off to switch back to He-3 target. Also had NMR sweep taken. Polarization is 56.4%.

    1125: Beam is back at 11 uA per Doug H. request

    1134: Started new HAPPEX run after the reference cell measurements

    1249: Beam off for Moeller measurement

    1515: Half wave plate is OUT.

    1400: Moeller measurement still in progress at end of shift.