Shift Crew
SL : Jin
Huang
TO: Mitra Shabestari
3rd:
Hoyoung Kang
Major
Events
- 16:00 Shift Start with MCC tuning beam over the
accelerator
- 16:10 MCC send beam through Hall A
- 16:14 BPM A=(-.5, 2.0); B=(-.5,1.9). Request Harp Scan on
both A & B
- 16:19 Harp IHA1H03A = 0.13x0.13; IHA1H03B = 0.13x0.11
- 16:29 After verifiying beam position on BeO screen. Raster
Size is checked on optics
target: OK
- 16:34 Target -> He3, Raster/Trigger rate check. Little
scratch on right top corner
with 6x6 raster.
- 16:45 Start Production.
- 17:29 Restart Happex Run: 31436
- 22:28 Restart Happex Run: 31437
Production Run List
- Beam = 11uA
- Target = Transverse - Polarization
Left |
Right |
2874 | 21755 |
2875 | 21756 | New Happex Run: 31436 |
2876 | 21757 |
2877 | 21758 |
2878 | 21759 |
2879 | 21760 |
2880 | 21761 |
2881 | 21762 |
2882 | 21763 |
2883 | 21764 | New Happex Run: 31437 |
2884 | 21765 |
2885 | 21766 |