NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 00:01:01 on June 4,2009
Entry number 278841
keyword=Swing shift SUMMARY
Day shift summary: S. Sirca (SL), H. Lu (TO). M. Mihovilovic (3rd)
==================================================================
EVENTS
------
16:07 evacuate D2 reference cell
17:10 start N2 calibration runs
18:45 go to pol. He3 production running
19:30 HAPPEX and Right-HRS DAQs die because adaql1 freezes, restore all
20:00 resume production
21:36 beam off, power supply trip in one of ACC magnets
23:20 MCC sends us pulsed beam, we switch to BeO target
23:25 "not-so-long-beam-off" recovery procedure
23:37 target lasers OFF/ON briefly to see beam spot on BeO
23:50 resume production
RUNS-L/BB
---------
#3154 empty reference cell, 9uA, 4x4 raster (7x5 MCC)
#3155 empty reference cell, 9uA, 2x2 raster (3x2 MCC)
#3156 N2 reference cell, 2psig, ps3=5
#3157 N2 reference cell, 2psig, ps3=10, JUNK
#3158 N2 reference cell, 2psig, ps3=10
#3159 N2 reference cell, 20psig, ps3=200
#3160 pol. He3, checkout, JUNK
#3161 pol. He3, 3.7M, 9uA, production
#3162 pol. He3, 4.0M, 9uA, production
#3163 pol. He3, 4.0M, 9uA, production
#3164 pol. He3, 1.9M, 9uA, production
#3165 spot++ with BeO at 2uA
#3166 spot++ with pol. He3 at 2uA
#3167 pol. He3, passed on to OWL shift
RUNS-R/ND
---------
#22026 empty reference cell, 9uA, 4x4 raster (7x5 MCC)
#22027 empty reference cell, 9uA, 2x2 raster (3x2 MCC)
#22028 N2 reference cell, 2psig
#22029 N2 reference cell, 2psig, JUNK
#22030 N2 reference cell, 2psig
#22031 N2 reference cell, 20psig
#22032 pol. He3, checkout, JUNK
#22033 pol. He3, 0.6M, 9uA, production, Right DAQ crash
#22034 pol. He3, 2.9M, 9uA, production
#22035 pol. He3, 2.9M, 9uA, production
#22036 pol. He3, 1.4M, 9uA, production
#22037 spot++ with BeO at 2uA
#22038 spot++ with pol. He3 at 2uA
#22039 pol. He3, 9uA, passed on to OWL shift