User name Higinbotham
Log entry time 09:38:56 on June 11, 2009
Entry number 280599
Followups:
keyword=Planned Configuration Changes
During the down, the Hall A Neutron Detector (HAND) will be moved back to 8 meters from
target and 54 degrees. [There are marks on the floor where this is.] The sieve plates for the two
spectrometers should be installed.
The right arm momentum should be set back to 2175 MeV/c and the quads. cycled.
We should also reinstall the Hydrogen (replacing Deuterium) in the reference cell.