User name V. Sulkosky
Log entry time 09:31:53 on June 15, 2009
Entry number 281555
keyword=Planned Activities During Access
The following is planned for the controlled access today:
1) Work on PVDIS electronics in right HRS hut (Ramesh).
2) Target survey and switch (Yi Qiang and Yi Zhang):
Polarized 3He target ladder will be removed and replaced with
a ladder that contains a single carbon foil.
3) BigBite sieve-slit will be inserted (Miha or Doug).
4) Perhaps work on HRS bogies (Hall A techs).
If anyone else needs to go into the Hall, please consult with the Hall A
run coordinator first. I plan to close the Hall no later than 17:00.