    User name V. Sulkosky

    Log entry time 09:31:53 on June 15, 2009

    Entry number 281555

    keyword=Planned Activities During Access

    The following is planned for the controlled access today:

    1) Work on PVDIS electronics in right HRS hut (Ramesh).

    2) Target survey and switch (Yi Qiang and Yi Zhang):
    Polarized 3He target ladder will be removed and replaced with
    a ladder that contains a single carbon foil.

    3) BigBite sieve-slit will be inserted (Miha or Doug).

    4) Perhaps work on HRS bogies (Hall A techs).

    If anyone else needs to go into the Hall, please consult with the Hall A
    run coordinator first. I plan to close the Hall no later than 17:00.

    A copy of this log entry has been emailed to: xiaochao,rsubedi,folts,doug,miham,camsonne,segal