The way I left the hut when we locked up this morning is as follows. (Dustin was in there after me. If he changed the configuration, he can log a correction.)
Left HRS: Aluminum covers were on the VDC. S0 was aligned to be parallel with the VDC and centered between the Al cover screw mounts. The downstream S0 PMT was roughly under the end of the HAPPEX detector. The HAPPEX detector is aligned by angle, and so there is a significant mis-match between the HAPPEX detector footprint and the S0 detector.
Right HRS: Al plate is off the VDC, again centered on the Al cover screw
mounts. The HAPPEX detector is well off to the side of the VDC, but is
connected to the counting daq.