Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Fatiha
Log entry time 00:01:53 on September 5,2009
Entry number 288075
keyword=Shift Summary
Shift crew: F. Benmokhtar, K. Aniol and X. Zhan
-----------
IMPORTANT: Keep an eye on the ABU, the automated ABU values
are going to the BANU values... Please fix it by hand until
Bob gets the chance to have a look at it.
16:00... Started shift with Bob doing the study of beam
position/spot++ run
16:18... Moved to Al dummy with a hole target, asked for 1uA.
16:45... Moved to Al dummy, 1uA
17:02... VDC HV turned off.
17:08... Asked for 2 uA, with Al dummy, to check the spot size.
17:16... Back to production, LH2, 100 uA
Smooth production running for the rest of the shift.
Run Summary:
------------
Spectrometer DAQ runs:
----------------------
24657/4466.... Spot test, 12C hole, 1uA --> well centered.
24658/4467.... Spot test, Al dummy with a hole, ps factors are
2 for both triggers. VDC HV = 0KV
24659/4468.... Spot test, Al dummy with hole 1uA, VDC HV = 4KV
500K event each.
24660/4469.... Spot test, Al dummy, 1uA, VDC HV = 4KV
24661 .... Spot++ check --> looks OK 5 by 4.5
24662 .... Spot++, 100 uA, LH2 target
Happex Runs:
------------
12002... 100K
12003... 100K
12004... 100K
12005... 100K
12006... 100K
12007... 100K
12008...