NEXT
Make New Entry,
Make Followup Entry
User name paschke
Log entry time 14:23:56 on September 5,2009
Entry number 288143
Followups:
keyword=Summary of controlled access activity - DAQ timing checked
Left arm: Checked parity DAQ integration gate relative to MPS. It is correct
and matches the right-HRS and counting house crates, ending 300 us before MPS
starts (at IT=13200) and starting 25 usec after MPS completes.
Right arm: connected ADCX-11 channel 3 to patch panel 14, for ADC sync.
Megan and Brian moved the collimator. I don't have details, but I guess it was
horizontal. About the right distance. Also something about the camera. They
should log it.
Alexandre also swapped a board, and he'll log that.