    User name paschke

    Log entry time 14:23:56 on September 5,2009

    Entry number 288143

    Followups:

    keyword=Summary of controlled access activity - DAQ timing checked

    
    Left arm: Checked parity DAQ integration gate relative to MPS. It is correct 
    and matches the right-HRS and counting house crates, ending 300 us before MPS 
    starts (at IT=13200) and starting 25 usec after MPS completes. 
    
    Right arm: connected ADCX-11 channel 3 to patch panel 14, for ADC sync.
    
    Megan and Brian moved the collimator.  I don't have details, but I guess it was 
    horizontal.  About the right distance.  Also something about the camera.  They 
    should log it.
    
    Alexandre also swapped a board, and he'll log that.