Log entry time 16:02:10 on September 5,2009
Entry number 288153
keyword=Day Shift Summary
Day Shift Summary
10:15 - Changed half-wave plate to IN position. Stopped Compton and HAPPEX runs for this change. Pockel Cell voltages changed to 8.532/6.167 for Gun2 and 5.025/5.000 for Gun3.
10:22 - Resumed taking data.
11:46 - MCC calls. Rebooting IOC. Down for 5 minutes.
12:25 - CODA crashed. Problem with ROC25. Rebooted that crate and restarted CODA. Now complains about g0 crate, ROC31. Changed configuration to HapSimple to avoid problems.
12:37 - Called for Controlled Access. Kent et al connect DAC signal
from Counting House crate to Voltage channel adcx11_3
14:15 - Kent et al out of Hall. Waiting for beam.
14:18 - Beam is back to 100uA.
15:29 - Beam off for like 10 minutes. Called MCC. RF cavity problem.
15:45 - Beam is back.
HAPPEX DAQ runs - Production at 100uA with 5.0x4.5 raster
12019 - 12030..