• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name R. Subedi

    Log entry time 13:33:49 on September 08, 2009

    Entry number 288636

    keyword=Access acitvity (pvdis only)

    Took opportunistic access to fix some of the issues with PVDIS setup.
    LHRS:
    Added 100 kHz clock in 4th NIM-ECL module ch14.

    Also found that the tagger was missing. The problem was with the LEMO
    barrel; I unplugged the barrel and re-plugged it; signal is there now.

    RHRS:
    Found that the MPS signal was inverted. Talked to Mark and Rupesh. They
    said Happex is fine with the existing setup of MPS. I just re-inverted
    MPS in the PVDIS setup only (Did NOT touch regular spectrometer MPS).

    Found that Dx10 signal on the scope has just 500mv signal, that may be
    the reason for not seeing Dx10 on the PVDIS scaler data. Will fix it in
    next access.

    A copy of this log entry has been emailed to: rholmes,rom,xiaochao,deng,dwang,pkpan,rsubedi