Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name bogdanw/V. Sulkosky
Log entry time 08:05:12 on September11,2009
Entry number 289081
Followups:
keyword=Owl shift summary
Full beam ~ 100 muA at 00:50
check spot++ done at 1:30
01:30-04:05 Beam tuning and profile check.
04:05-04:15 Raster check. New size 11 mm x 7.5 mm.
04:16 Move Target to LH2 loop 3.
04:22 Ask for 100 uA for production.
04:39 Move target to optics while MCC continues tuning.
06:10 Beam tuning complete. MCC now adjusting beam position to
nominal production settings.
06:32 Beam profile checked with harps, size is comparable to earlier
results. Asked MCC to restore raster.
06:40 Raster check completed 5 mm x 4.6 mm.
06:40 Move target to loop 3 LH2.
07:20 Raster size changed to 11 mm x 8.5 mm.
Lumi asymmetries still ~ 1500 ppm.
Run Start Events Comments
++++++++++++++++++++++++++++++++++++++++++++++++++++++++
12224 06:50 55.3k Lumi RMS ~ 2000 ppm
12225 07:21 Continue to next shift, Raster 11 mm x 8.5 mm