Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name fansler/ewing
Log entry time 15:34:37 on September 11, 2009
Entry number 289134
keyword=Cryo/Power Supply Faults
The left Q1 liquid level meter has been replaced. The liquid level was
behaving erratically. We noticed the lead flows were low so R. Norton
adjusted the lead flow capacity and all lead flow have been adjusted to
spec. There were multiple magnet trips and resets as a result of the
initial LQ1 trip. All power supplies have been reset.