Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name A. Deur
Log entry time 16:05:20 on September12,2009
Entry number 289247
keyword=Day shift summary
8:00 Starting the shift. Status:
*Continuing data taking with production run 12245.
*No right HRS Q2.
*No Target Op. (Vince staying until volunteer Mark Dalton arrives).
*No Compton.
*No Food for the shift crew.
9:02 Done with run 12245. Start run 12246. TO M. Dalton arrived (did not know he was volunteered).
9:59 Done with run 12246. Start run 12247 (although we expect access near 10am).
10:15 Hall in controlled access to fix Q2 (Jack S. went in). Stop run 12247. Start pedestal run 12248, per Mark Dalton request.
11:17 pedestal run 12248 finished. Started a new pedestal run, 12249.
11:28 Stop run 12249: no events: coda seems to be hanged. We killed coda and started over.
11:50 Coda fixed. Started pedestal run 12252
12:28 right Q2 seems to work fine now. Jack and Heidi are out. We called MCC asking to lock the hall and bring back the beam.
12:36 Stop pedestal run 12252.
12:37 Requested 5 uA to check first the raster. Raster size is 7*5. A little bigger than requested (6.0*4.5).
12:38 Compton HV trip
12:39 Short HRS DAQ run for spot++ (run 24696). Eevrything looks good. Asked for 100 uA.
12:43 We have 100 uA. Start production run 12253 (**with good right arm**)
13:16 MCC is sending pulse beam to improve the tune in order to reduce the compton rates. Should take ~10 min. -> stop run 12253.
13:23 MCC done. They are restauring 100 uA. Start production run 12254
14:20 Run 12254 finished. Start production run 12255
14:41 MCC called: they will take the beam for a short while to cycle two quads on our line (1HO2 and 1C15).
14:48 Beam back. Run 12255 continuing.
15:12 Compton HV trip.
15:17 Run 12255 finished. Starting run 12256.
15:31 Compton HV trip.
15:47 Compton HV trip
15:48 Jay Benesh called, requesting PMT HV for scanners 1C18A&B and 1C07A&B to be turned on (MCC have no control of them anymore and want to run the harp for diagnostic).