keyword=day shift summary
Day shift summary
Shift worksers: J. P. Chen (SL), X. Yan (TO), K. Allada (3rd)
8:00 smooth production data taking with 100 uA
9:44 MCC took beam away to tune, beam was on the edge of scraping.
(supposed to be only 10 minutes work).
10:18 beam back, resume production. Compton was still off.
10:34 Compton HV could not be turned on. The tuning was not good
for the Compton. Need to retune. Stopped production run .
11:39 MCC un-did the tuning. We are abck to what we were (before 9:44). Beam back and resum production.
11:39-14:44 data taking
14:44-16:00 Right Q1 fluctuation, access.
16:00 beam tuning
Production runs on LH2:
12301 7:35-8:31, 100 uA, HWP IN, 100K.
12302 8:31-9:28, 100 uA, HWP IN, 100K.
12303 9:29-9:44, 100 uA, HWP IN, 26K, Stopped for beam tuning.
12304 10:18-10:34, 100 uA, HWP IN, 27K. No Compton. Stopped for re-tuning for Compton.
12305 11:39-12:36 , 100 uA, HWP IN,100K
12306 12:36-13:33, 100 uA, HWP IN, 100K
12307 13:33-13:54, 100uA, HWP IN, 36K, left Q1 current fluctuation
12308, left Q1 fluctuate, junk.
12309, 14:01-14:44, 100uA, HWP in, 75K, left Q1 still fluctuate.