• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Sarah

    Log entry time 18:52:32 on September 18, 2009

    Entry number 290400

    keyword=Run Plan for Tonight

    Run Plan

    1. The plan for the night: Take production data! Watch the lumi widths to see if anything changes. Please check the histograms on the online data monitor with the reference ones on the shift how-to page (http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#HPXStartingonlineanalysis).

    2. Take Compton data! You will need to start a new Compton run every two hours. The CODA screen to start and stop the Compton runs is in the back room. The optimal background rate seems to be 100 Hz/muA, but if it over 300 Hz/muA, call MCC and have them adjust the beam tune.

    3. Run spot++ every couple of hours and log it. Change the prescale factor PS8 to 1 and PS1 and 2 to 99999 for this.

    4. Change the half-wave plate state when we get to 1M good pairs. Follow the instructions for doing this and running the flipper script here: http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#ChangingHalfWavePlate

    5. Keep an eye on the HP heater on the target. See halog entry 290365.

    6. Bob Michaels will do a Compton DAQ test tonight on the owl shift.

    7. If you lose beam for an extended period, do our beam diagnostics to make sure that everything is good (the optimal values for the raster, beam position, beam current, lumi RMS, and detector asymmetry RMS are on the whiteboard).

    8. We are really behind in our data goals at this point. Please do not be shy about calling in the expert on something if it is holding things up.


    Concerns