• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Sarah

    Log entry time 17:04:38 on September 19, 2009

    Entry number 290555

    keyword=Run Plan for Tonight and Tomorrow

    Run Plan

    1. The plan for the night: Take production data! Watch the lumi widths to see if anything changes. Please check the histograms on the online data monitor with the reference ones on the shift how-to page (http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#HPXStartingonlineanalysis).

    2. Take Compton data! You will need to start a new Compton run every two hours. The CODA screen to start and stop the Compton runs is in the back room. The optimal background rate seems to be 100 Hz/muA, but if it over 300 Hz/muA, call MCC and have them adjust the beam tune.

    3. Run spot++ every couple of hours and log it. Change the prescale factor PS8 to 1 and PS1 and 2 to 99999 for this.

    4. Change the half-wave plate state when we get to 1M good pairs. Follow the instructions for doing this and running the flipper script here: http://hallaweb.jlab.org/experiment/HAPPEX/opmanual/opmanual.html#ChangingHalfWavePlate. Please note that there are updated instructions for using flipper (including logging in as apar using -Y).

    5. Keep an eye on the HP heater on the target. See halog entry 290365.

    6. Bob Michaels will come in to do the second part of his Compton DAQ tests tonight at 11:00pm (it will run until 3:00am). This will not affect the production running.

    7. If you lose beam for an extended period, do our beam diagnostics to make sure that everything is good (the optimal values for the raster, beam position, beam current, lumi RMS, and detector asymmetry RMS are on the whiteboard).

    8. We are really behind in our data goals at this point. Please do not be shy about calling in the expert on something if it is holding things up.

    9. At about 10:00am tomorrow, Rupesh will come in to do a second position scan. I will post instructions for this in a later post.

    10. After the position scan, if Alexandre wants to make his access, he'll do it then.

    11. Swing shift tomorrow: Dustin is tentatively planning on a Q^2 measurement, depending on how his data analysis tonight goes.


    Concerns