Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name mercado
Log entry time 16:04:04 on September21,2009
Entry number 290884
keyword=Day Shift Summary
8:48 - MCC called. Tuning beam.
8:55 - Finished calibrating orbit lock. Back to CW beam.
9:10 - Dithering back on.
10:33 - MCC called. Pulse beam to make some fixes.
10:37 - Beam back.
13:02 - Ended 12545 in the middle to change raster size. Back with raster 10x10. Lowered by 10% in each dimension.
13:08 - MCC called. Sending pulse beam. Turned modulation off.
13:37 - MCC called. Sending back beam but will lower raster again by 10%.
13:44 - MCC called. Told to turn dithering back on. Told to try 5 cycles to see if the beam is tripped.
14:15 - Going back to 10x10. Run 12549.
14:39 - Trying dithering again.
14:50 - Left dithering on.
Production Runs:
12539-12550