    8:48 - MCC called. Tuning beam.

    8:55 - Finished calibrating orbit lock. Back to CW beam.

    9:10 - Dithering back on.

    10:33 - MCC called. Pulse beam to make some fixes.

    10:37 - Beam back.

    13:02 - Ended 12545 in the middle to change raster size. Back with raster 10x10. Lowered by 10% in each dimension.

    13:08 - MCC called. Sending pulse beam. Turned modulation off.

    13:37 - MCC called. Sending back beam but will lower raster again by 10%.

    13:44 - MCC called. Told to turn dithering back on. Told to try 5 cycles to see if the beam is tripped.

    14:15 - Going back to 10x10. Run 12549.

    14:39 - Trying dithering again.

    14:50 - Left dithering on.


    Production Runs:
    12539-12550