User name D. Parno
Log entry time 16:00:11 on September23,2009
Entry number 291178
keyword=Day Shift Summary (23 Sep 2009)
Day Shift Summary (23 September 2009)
Shift crew: Diana Parno (SL), Paul Reimer (TO), Stanley Kowalski (3rd)
Began shift in production running at 99 uA, taking data for Slug 12 (IHWP IN), Run 12597.
07:55 - Lost communication with LHRS magnet control IOC (iocha14). Rebooted IOC. Cycled magnets out of an abundance of caution (it turns out thi s was not necessary).
08:30 - LHRS magnet momentum values reached their setpoint of 3.14159 GeV/c.
08:45 - We realize CODA has not been collecting any events in Run 12598. Fixed with kcoda, startcoda.
09:07 - Beam down due to HV trip on RF cavity. Switched to pedestal runs
09:44 - Beam is back.
12:18 - Beamline HV crate trips.
14:15 - Turns out Run 12606 crashed about halfway through without anyone realizing.
14:26 - Beamline HV crate tripped again.
15:16 - Compton HV tripped.
15:19 - Compton gamma rate (from Saclay DAQ) stopped updating. No complaints from CODA. I stopped run and then started it again.
Finished shift in production running at 97.8 uA (Run 12609).
PRODUCTION RUNS
Run #....Good Pairs
12597......33.0k
12600.......5.7k
12602......41.0k
12603......32.6k
12604......26.7k
12605......32.2k
12606......15.9k
12608......43.3k
PEDESTAL RUNS
Run #
125601
JUNK RUNS
Run #.
12598
12599
12607