Swing shift summary:
shift workers: J. P. Chen(SL), M. Muangma (TO), M. Huang (3rd)
16:00 production data taking, 100 uA on LH2.
16:20 beam off, RF problem.
17:03 beam back.
17:20-17:17:30 beam trippy.
17:30-21:50 smooth data taking.
19:24 spot++, raster size 6x5 (MCC 10x10)
21:25 spot++ again, same as previous one.
21:50-22:20 Test for pita slope. stopped Compton. turned off dithering.
22:20-23:40 Detector linearity (LED) test, with 50 uA.
22:45 Friend made a change to BCM cable U3/U1_right for Compton purpose, see halog 291488.
22:45 Compton restarted.
23:45 Back to 100 uA, production. dithering back on. pita feedback with new slope (-4749 ppb/V).
24:00 production run continue to next shift.
run info:
12643 17:03-17:59, 100K. 98 uA on LH2.
12644 18:05-19:01, 100K.
12645 19:02-19:58, 100K.
12646 19:59-20:51, 100K.
12647 20:56-21:53, 100K.
12648 pita scan
12649-12653 LED test runs
12654 23:45- still on-going at the end of shift.