Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Subedi
Log entry time 18:08:08 on September 29, 2009
Entry number 292292
keyword=access work for pvdis
In both spectrometers, a copy of each VME1 and GMN2 signals from Happex
timing board is taken to pvdis setup to replace existing pvdis LNE and
MPS signals, respectively. The fan out of these signals has no
interference with Happex setup, since the fan out copy has perfectly a
NIM signal (for both Happex and pvdis in left HRS and only for pvdis in
right hrs (since in right hrs happex uses an ECL cable, no problem here)).
From here, only for pvdis:
In both hrs pvdis setups, replaced 100 kHz signals from left hrs 103.8
kHz clock (this hrs 107.8 kHz clock is also taken to right hrs pvdis
setup). Tried to do left pvdis troubleshooting, only two runs with pocket
pulser as input taken (run 24932 with all ribbon cable polarity not
changed, run 24933 only top TDC ribbon cable polarity flipped). Analysis
will be done later.
A copy of this log entry has been emailed to: zhaobo,rom,xiaochao