    It appears that during the down things on the laser table shifted
    somewhat. We tried to lock the cavity as usual this morning and it
    didn't work. There was an epics event at about 19:30 last night so
    initially we thought it was related to this. After investigating this
    for a while the laser was aligned in its unlocked state (a tricky job
    indeed.) A crude lock was found and the position optimised in the locked
    state (much easier.)

    Megan tells me that the photon detector table appeard to have been
    shifted too. This may all be related to some ion chamber work in the hall.

    Two epics ioc reboots and a compton computer reboot were required in
    diagnosing the problem. :-)

    We achieved 1015 kW in the cavity with the following mirror positions:
    1V: 125
    1H: -70
    2V: 2220
    2H: -1480