NEXT
Make New Entry,
Make Followup Entry
User name R. Subedi
Log entry time 23:58:27 on October 3,2009
Entry number 292999
keyword=Shift Summary
Both left and right HRS momentum setting = 3.14159 GeV/c.
Both left and right HRS angle = 14 degree.
Beam energy (3 pass) = 3482.9 MeV.
Beam current = 98.2 uA.
Half wave plate: OUT
Slug Number=17
Shift Crew:
Rupesh Silwal (3rd), Abdurahim Rakhman (TO), Ramesh Subedi
16:00 Shift starts with a continued smooth production.
Run Good pairs Comments
12915 37.7k
12916 44.7k
12917 38.3k
12918 44.4k
12919 39.0k
12920 36.9k
12921 42.9k
12922 48.7k
12923 ---- short run (total events 30 k (not 30 k piars)), Hall C IA setpoint fluctuated, Rupesh is working on it.