Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name R. Michaels
Log entry time 04:51:50 on October 4,2009
Entry number 293032
keyword=IHWP changed to IN
Put IHWP to in. New slug 18.
Stop Compton run 20063 prior, start new run 20064 after.
Next HAPPEX run will be 12930.
[apar@adaql1 ~]$ flipper
****************************************
Only run this program when the IHWP change has
already been made. If not, please Ctrl-C out now!
Current slugnumber = 17
Increment slugnumber? (Y/N)
Y
New slugnumber = 18
Current IHWP = IN
Desired Settings for IHWP = IN
Hall-A IA = 4.79
Hall-C IA = 5.2
PC Pos = 8.588
PC Neg = 6.112
RHWP = 1200
Current settings (to be changed)
Hall-A IA = 4.79
Hall-C IA = 5.2
PC Pos = 8.397
PC Neg = 6.303
RHWP = 1200
Writing the current seetings to file /adaqfs/halla/apar/feedback/IHWP.OUT for the next flip back.
Performing Flip to IHWP = IN settings
Halfwave plate IN, Slug 18
Making halog entry.
Writing Pockels cell epics variables.
Done... Please verify the new setpoints in the HAPPEX Feedback Monitor.