    12:00 shift starts
    
    1:50 stopped the run 12926 in the middle of the way, ask MCC to deliver 5uA 
    beam for the compton low-I test.
    	Also, "Run 12926 ended failed". Bob fixed it. #12926 is still a good 
    run.
    
    2:45 compton low-I test ended, and ask for 100uA. 
    
    4:45 change HWP to IN
    
    
    ----------------------------
    #12925 00:25	39.9K 	
    #12926 1:20	31.8K
    #12927 1:56     5 uA for compton low-I test
    #12928 2:50	100uA production 45.1K
    #12929 3:47     production 43.6K
    
    change HWP to IN, slug 18
    
    #12930 4:45	43.7K
    #12931 5:50	40.5K
    #12932 6:49	49.8K (100% efficiency) Ow, Record!!!