User name Carlos
Log entry time 23:56:50 on October 7,2009
Entry number 293752
keyword=Swing shift summary
Shift crew:
------------
Carlos Munoz Camacho
Giuseppe RUSSO
Chiranjib Dutta
16:00 Shift started running production.
16:53 MCC called, RF problem, expert paged. Run stopped.
17:00 Problem "solved by itself". Back to production.
17:05 Half-wave plate IN.
17.26 MCC called: cryo problem. Down for a "while".
18:20 MCC estimate for beam back was 11pm.
18:45 Went on controlled access (for PVDIS DAQ work).
21:00 Beam back expected at 10pm.
21:50 Beam back! Back to production (after routinary checks).
23:40 MCC called. Had the same cryo problem again (3-4h down).
00:00 No beam...