    User name Carlos

    Log entry time 23:56:50 on October 7,2009

    Entry number 293752

    keyword=Swing shift summary

    Shift crew:
    ------------
    Carlos Munoz Camacho
    Giuseppe RUSSO
    Chiranjib Dutta

    16:00 Shift started running production.
    16:53 MCC called, RF problem, expert paged. Run stopped.
    17:00 Problem "solved by itself". Back to production.
    17:05 Half-wave plate IN.
    17.26 MCC called: cryo problem. Down for a "while".
    18:20 MCC estimate for beam back was 11pm.
    18:45 Went on controlled access (for PVDIS DAQ work).
    21:00 Beam back expected at 10pm.
    21:50 Beam back! Back to production (after routinary checks).
    23:40 MCC called. Had the same cryo problem again (3-4h down).
    00:00 No beam...