    Log entry time 08:03:05 on October10,2009

    Entry number 294201

    keyword=Owl Shift Summary

    00:00 Low current tests are finished and 100uA beam has been requested.

    00:02 Production run 13125

    00:15 Up to 99uA. Although there are frequent long trips.

    01:05 Production run 13126
    02:01 Production run 13127
    02:59 Pedestal run 13128

    02:59 MCC is taking beam away for a little while for path length studies.

    3:37 Beam back, production run 13129
    4:34 Production run 13130, stopped accidentally
    4:48 Production run 13131
    5:45 Production run 13132
    6:44 Production run 13133
    7:41 Production run 13134