Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jroche
Log entry time 23:59:33 on October 10, 2009
Entry number 294321
keyword=swing shift summary
Swing shift summary
Timeline
16:00- no beam, the separator (RSEP8A) is having stability issue, MCC is investigating
17:40- beam is back, checked spot size, put target in beam, on to data
taking starting run 13147
18:46- the magnet expert is on site, the cycling is happening.
20:27- the beam is back, but for now the current is limited to
10uA. MCC is trying to assess bleed through of the A laser to B beam.
20:30- beam to 100 uA
21:34- Diaocheng reports that yes indeed the rates seen by the Compton
do not allow any data taking with the polarimeter, we carry on data
taking that is actually pretty smooth beside that,
23:00- beam at 20 uA while MCC is adjusting the beam spread for Hall A
Run List
number: kilos of good pairs -- cumulated kilos of good pair
13147: 38 --
13148: no beam, pedestal run
13149: no beam, pedestal run
13150: 45 -- 93
13151: 34 -- 123
13152: 25 -- 148
13153