    User name ZAFAR AHMED

    Log entry time 16:04:05 on October14,2009

    Entry number 294903

    keyword=Day shift summary

    8:42 Parity run 13251 ended.
    8:43 Parity run 13252 started.

    9:35 Bob is going to restart the HAPPEX DAQ because PNANGUIN is not responding.
    9:36 Parity run 13253 started.

    10:10 Vacuum valve VBV803 is closed. MCC wants to open it. It will take two hours so we do not have beam for next two hours.

    11:11 Parity run 13254(pedestal) ended.
    11:11 Parity run 13255(pedestal) started.

    11:50 MCC is going to send beam. I turned off the LeCroy HV ch 1 (Compton) because it was dropping and we do not have the beam.
    13:01 Turned on the Compton HV ch 1.

    14:14 Parity run 13256 ended.
    14:16 Parity run 13257 started.
    14:56 After 20 min of struggle to stablize the target temperature we asked the MCC to stop the beam while we reboot our target IOC.
    14:10 Beam dropped, temperature dropped, Luis immideately turned on the auxillary heater, temperature is stable,
    14:11 MCC is took the beam away for next 4 hours for injector tuning.
    14:14 Auxillary heater is off.