User name ZAFAR AHMED
Log entry time 16:04:05 on October14,2009
Entry number 294903
keyword=Day shift summary
8:42 Parity run 13251 ended.
8:43 Parity run 13252 started.
9:35 Bob is going to restart the HAPPEX DAQ because PNANGUIN is not responding.
9:36 Parity run 13253 started.
10:10 Vacuum valve VBV803 is closed. MCC wants to open it. It will take two hours so we do not have beam for next two hours.
11:11 Parity run 13254(pedestal) ended.
11:11 Parity run 13255(pedestal) started.
11:50 MCC is going to send beam. I turned off the LeCroy HV ch 1 (Compton) because it was dropping and we do not have the beam.
13:01 Turned on the Compton HV ch 1.
14:14 Parity run 13256 ended.
14:16 Parity run 13257 started.
14:56 After 20 min of struggle to stablize the target temperature we asked the MCC to stop the beam while we reboot our target IOC.
14:10 Beam dropped, temperature dropped, Luis immideately turned on the auxillary heater, temperature is stable,
14:11 MCC is took the beam away for next 4 hours for injector tuning.
14:14 Auxillary heater is off.