    User name meekins

    Log entry time 11:28:47 on October15,2009

    Entry number 295048

    keyword=Target transfer line inspections and loop 3 inlet temp

    Inspected transfer lines at the top of the target. Both lines are warm to the touch with no condensation. The loop 2 JT was cracked open and some flow was passing through that circuit. The valve was closed. Loop 2 inlet temp is rising. I will keep a watch on the loop 3 inlet temp. The hope is that this will return to a cooler temp.