Log entry time 16:02:05 on October15,2009
Entry number 295074
keyword=Day Shift Summary
8:00 Shift starts with beam starting to return. Ask for them to correct the BPMA Y.
8:25 MCC fixed BPMA Y.
8:27 Start production at 100uA.
8:40 LUMI widths 1400 reduce current to 96uA to check.
10:32 MCC starts injector work. No beam.
16:00 Shift Ends no Beam
Production Runs
13280 8:26-9:22 100k
13281 9:22-10:11 86k
13283 10:17-10:33 26k