Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name M Friend
Log entry time 08:01:38 on October20,2009
Entry number 295812
keyword=Owl shift summary
Stable beam, Happex production running, Compton production running.
1:27 Start Compton HV test runs.
1:28 During run 13418 and the begining of run 13419 BPM12x was saturating. MCC fixed the problem by doing a FFB gain search. We lost about 30 minutes of data.
Compton beam posistion a little unstable at times, and had some HV trips and rate increase at the end of the shift, but otherwise smooth running.
Run list
13418 24.6k
13419 37.5k
13420 40.3k
13421 40.8k
13422 44.7k
13423 41.9k
13424 41.5k
13425 43.4k