Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Yi Qiang
Log entry time 10:15:02 on October 20, 2009
Entry number 295827
This entry is a followup to: 295664
Followups:
keyword=RC Summary (Oct. 19 Day shift ~ Oct. 20 Owl shift)
RC report (Oct. 19 Day shift ~ Oct. 20 Owl shift)
Monday, Oct. 19, Day shift
- Production running at 98 uA.
- 08:41 Move IHWP OUT, start Slug 27 since run 13398: halog
295661.
- 09:00-10:00 Beam tuning for Compton, didn't interrupt with production.
- 12:35-13:25 Beam off due to east arc BPMs.
- 15:20-15:40 Beam off due to dog 2 tripping off.
Monday, Oct. 19, Swing shift
- Production running at 98 uA.
- 20:45-21:15 Compton low current coincidence test with 15uA beam: halog
295764.
Tuesday, Oct. 20, Owl shift
- Production running at 98 uA.
- 01:30-02:00 BPM12x saturation during run 13418 and 13419.
Beam time
Shift |
ABU |
BANU |
BNA |
2009/10/19 Day | 6.35 | 0.27
| 1.39 |
2009/10/19 Swing | 7.66 | 0.21
| 0.14 |
2009/10/20 Owl | 6.63 | 0.07
| 1.28 |
Total | 20.64 | 0.55
| 2.81 |
Coulombs So Far
- We are currently on Slug # 27 (IHWP OUT).
- Coulombs taken in all so far: 165.5 C as of Tuesday 09:00
10/20/2009.
Concerns
- Please always check online hists and compare them to the reference
ones.
- If you find something strange or wrong, please HALOG it so that the
expert can check it.
- Target Operator, please always check target PID system and strip
plots to make sure all the systems work.
- The cryo flow rate around 25.2g/s and JT value is around 55.5
since this is better for Lumi widths.
- The flow rate and JT value setting are sensitive to the outside
temperature. Hence the settings may change from morning to evening.
- Please be patient when you adjust the JT value since it may take a
few minutes to make the cryo flow rate stable.