User name K. Grimm
Log entry time 16:12:16 on October20,2009
Entry number 295860
keyword=K. Grimm
SL: Klaus Grimm
TO: Chun-Min Jen
3rd:ZAFAR AHMED
Summary
=======
Smooth production runs at 97uA
run OK pairs (k) IHWP
13428 38.3 OUT
13429 46.4 OUT
13430 46.4 OUT total OK pairs : 1012.7k
-----------------------------------
13433 41.5 IN
13434 42.4
13435 22.1 (beam off at the end)
Special runs
134232 Dedicated run at 50uA for Happex detector linearity tests performed by Rupes
Pedestal runs (no beam)
13436
13437
Corrupted runs (CODA crash, missing root files)
13426
13427
Details
=======
Shift starts with Happex run 13426 at 97uA and IHWP OUT, slug 27
08:08 Compton GSO HV trips. Turned HV on (was set to -1800V from previous shift)
08:30 Compton run 20540 crashed, coda restart
08:40 start compton run 20451
08:42 Could not prompt runs 13426 and 13427
08:45 Runbird was complaining about missing analyser. Caused by a stalled Happex CODA.
Zafar killed coda and did a "startcoda".
08:49 Start Happex run 13428
09:15 Started Coda on left arm
09:24 Spot++ run 25099, raster size on target: 6.5 x 5 mm
09:41 Computer Center called in and is asking for ~5min downtime for updating webservers. So during the down time
we would not be able to make any log entries (manual+automatic). A good time would be during beam studies or
other schedules downtimes but nothing seems to be scheduled for the day shift. Since we have production runs
I urged CC to call the run coordinator.
09:45 Starting prompt analysis which apparently crashed during this morning.
09:46 Start Happex run 13429
10:32 Start Compton run 20542
11:50 Changed IHWP to IN, starting slug 28
11:52 Start Happex run 13432. Dedicated run at 50uA for Happex detector linearity tests
performed by Rupesh
12:14 Start Happex run 13433
13:07 Compton GSO HV trip.
13:11 Start Happex run 13434
14:08 Start Happex run 13435
14:29 Start Compton run 20545
14:45 After some beam trips beam is off now
14:55 MCC: A magnet in south linac is down and its power supply must be replaced. There will be no beam for ~30 min.
15:06 Start Happex run 13436: dedicated pedestal run (beam off)
15:47 Start Happex run 13437: dedicated pedestal run (beam off)
16:08 Resuming beam at 98uA