• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name D.Wang/X.Deng

    Log entry time 22:48:19 on October 21, 2009

    Entry number 296045

    keyword=access work (PVDIS)

    In order to diagnose the BCMs. We copied U3 and D3 from the right arm and send them to the left arm through those long thick cables.

    On the right arm upstairs output for BCM d3 from the Lecroy level translator goes to a Fan-In/Out. Then one copy still goes downstairs to the right arm DAQ. Another copy goes to the left arm NIM-ECL 5 channel 13 through the long thick cable #3.

    output for BCM u3 from the Lecroy level translator goes to a Fan-In/Out. Then one copy still goes downstairs to the right arm DAQ. Another copy goes to the left arm NIM-ECL 5 channel 14 through the long thick cable #4.

    signals are checked on scope. Waiting for the beam to check whatever we'll get.



    A copy of this log entry has been emailed to: xiaochao, rsubedi, rom, pkpan