User name W. Deconinck
Log entry time 14:38:14 on October 22, 2009
Entry number 296117
This entry is a followup to: 296114
keyword=More information on target loop 3->2 switch-over
It will take until the end of the day (6pm) to get loop 2 set up, and
cool down will only be able to start tomorrow morning. In the evening we
will hopefully be able to evaluate whether the fast feedback is now
working and take a Moller measurement.
For the empty target measurements, we will be able to use the loop 3
(when loop 2 is cold) with 5 uA beam.