Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Fansler
Log entry time 15:50:26 on October 22, 2009
Entry number 296120
Followups:
keyword=Cryo since power loss
Cryo since power loss 10-20-09
All vacuums were checked, and verified good (0 Mtorr). We replaced the
blower on the LQ1. The return valves (WEKA) on the left and right Q2/Q3
magnets were verified open and unplugged. The 04/16 valves on the Q1’s
and Q2’s were calibrated. The calibration drifted due to radiation
damage. Q3 valves were verified with in calibration. All lead flows
were adjusted to “normal” levels. All magnet lead heaters were checked
and verified operational. Lead flows may need to adjusted again after
target cool down.