They believe they have fixed the Fast Feedback system. They
have been running beam at 5 µA into our Hall, and it seems to
be operating properly. They would like to confirm that it works at
full nominal current (i.e. at 1900 µA). I check that target is in
the "empty" position (which is a lousy name, by the way, since it means
that no target is in the beam, not that an empty target is in the beam
path), and that the Compton electron detector is in the "garage", and
tell them they can go ahead.