User name A. Camsonne
Log entry time 03:41:08 on October 24, 2009
Entry number 296397
keyword=Compton runs wish-list - Rough plan
Since HRS are down for an undetermined time, I guess we can focus on
the Compton until the spectrometers are up , I hope they will get the
tune right :
-things we absolutely need : ( day / swing )
-FADC data at 1800 V 4x 2hours and 1725 V 2 x 2hours runs, single photon
the shift crew can take runs during the day, and they can change the
HV of beamline slot 11 channel 1 to 1725 V after 2 hours
-things needed ( swing owl )
Diancheng or Megan : swing shift, put electron detector in :
--bump study 7.5 mm coincidence : 2 x 30 minutes runs
- coincidence run different currents 10( if it works ) 15 50 75 100 :
4 x 30 minutes runs
- linearity test pulser with different currents ( Megan day / swing )
-nice to have
--CompSimple with DMA and latency for Edet ( possibly sending busy to
Edet inhibit )
-- more analog signal trace and noise study, additionnal grounding
during access ( day Alexandre )
--test/debug small event size ( swing Alexandre )
--histogramming, single electron spectrum and asymmetry ( run electron
single )
-- electron detector tune ( day saturday or sunday )
-- mini spin dance - moller and compton for several Wien angle ( with
Moeller ? 3 points ? day saturday or sunday )
I still hope we will get right arm up I think it is a matter of
getting the level meters to be stable.