• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name W. Deconinck

    Log entry time 19:23:55 on October 24, 2009

    Entry number 296476

    Followups:

    keyword=Run plan with magnets up in right arm

    We got the right arm back up (yay!) and this is the modified run plan:
    - (empty target is currently in the beam)
    - check raster size (with right arm)
    - harp scan at 5 uA
    - check the rates on the detectors
    - move loop 1 target in the beam