Log entry time 13:07:13 on October 25, 2009
Entry number 296617
keyword=Run plan for rest of 10/25 day, swing, owl, and tomorrow 10/26
Currently (1pm) Sasha is working on the injector phase studies, which
should be finished in about one hour. Then we go back to production
running. The Compton was nicely tuned this morning before we went to
Moller studies, so we expect it to come up again without problems.
- 10/25 day: finish Moller at 2pm and go back to production (possibly
tune Compton)
- 10/25 swing: production (possibly one of the below studies)
- 10/26 owl: production
- 10/26 day: 9-13: pass change B (1->5), evacuation target loop 3 (TBC),
Q2L repair by Jack (TBC), start-up after pass change with cold loop 1 and
empty loop 3 at 5 uA
- 10/26 swing: reconnect loop 3 to inert He gas flow, move to loop 1,
production
Additional studies that still need to be scheduled (attempted in order of
priority):
- Boiling, density fluctuations effects on lumi widths
- Higher momentum R arm for rescattering
- Lower momentum L arm for inelastics
- low current cavity BPM calibrations (Bob)
- oversampling tests (Bob)
A copy of this log entry has been emailed to: paschke, mcnulty, rom, dalton