User name mcnulty
Log entry time 18:36:50 on October 26, 2009
Entry number 296732
keyword=MCC operator just put 10uA unrastered beam on our dummy Al target!!!!!
MCC operators delivered 10uA unrastered beam on our dummy Al target for
about 2 or 3 minutes! According to the target spec sheet, this target
requires a rastered beam at all times. We need this target this evening
for our background measurements. This type of operator error is
unacceptable under any circumstances. Our shift leader told the operator
we were doing a raster size check and asked for 10uA. MCC operators need
to refer to the target spec sheet at all times for safe delivery of beam
to target.