Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 12:08:12 on November 01, 2009
Entry number 297085
This entry is a followup to: 297084
keyword=Re: Pion Rejector Channel 21 Pedestal Fine
For the current run, PR layer 1, channel 21's pedestal looks fine. Perhaps
the wide pedestal was caused when I reconnected the ribbon cable to the
ADC.
A copy of this log entry has been emailed to: rsubedi,xiaochao,reimer