    00:00 Begin shift with detector checkout.
    00:55 Ask for Controlled Access to investigate left HRS trigger problem.
    03:05 Access complete. Ask for beam permit.
    03:15 Beam back into the hall. Resume detector checkout.
    03:51 No beam due to MCC IOC problem.
    03:54 Beam back and resume detector checkout and HV matching for left HRS.
    05:45 Completed left HRS S1, S2m and gas Cerenkov alignment.
    Could not align pion rejector, since the cable map is wrong!
    05:48 Move target to holey carbon for beam position and raster check.
    06:53 MCC called beam will be away in 5-10 minutes for them to address a magnet problem.
    06:45 Noticed that left Q1 had tripped off around 5:45. We did not
    notice since the alarm handler was not enabled and we were doing
    beam position scans.

    Nominal BPM positions:

    BPMA: (-2,1.25)
    BPMB: (-3,1.5)

    07:08 MCC called magnet repairs are being put off until the downtime later this morning.
    07:15 Ask for raster off for bulls eye scan.

    Bulls eye scan Run list:


    Left/Right Run Comments
    ==============================================================
    25214/4774 A (-2,1.25), B (-3,1.5)
    25215/4775 A (-2,3), B (-3,3)
    25217/4777 A and B at (0,0)
    25218/4778 A and B at (-3,-3)
    25219/4779 A and B at (0,-3)