Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 09:54:26 on November 5,2009
Entry number 297575
keyword=S2m Gain Matching
L-HRS S2m gain matching mostly completed. It appears that the left
side channels 1 and 2 are swapped. Ramesh and Kai will investigate.
It was probably swapped at the patch panel on the second floor.
All channels are aligned to about 35 channels.
Figures 1 and 2 show channels 0-5 and 6-11 respectively.
FIGURE 1
FIGURE 2