• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name V. Sulkosky/R. Subedi

    Log entry time 12:14:43 on November 6,2009

    Entry number 297805

    keyword=Pion Rejector Fixed

    I found that one of the ADC ribbon cables was offset by one. Hence the missing channel and the apparent shift in the HV mapping. I think
    the HV map corresponds correctly to the ADC channels now. I will
    produce an updated map and make another Halog later.

    The affected ADC channels were 32-47, which affected PR layer 1 channels 32,33 and PR layer 2 channels 0-13. I verified that the missing channel PR layer 1 channel 32 now has a signal.