Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky/R. Subedi
Log entry time 12:14:43 on November 6,2009
Entry number 297805
keyword=Pion Rejector Fixed
I found that one of the ADC ribbon cables was offset by one. Hence the missing channel and the apparent shift in the HV mapping. I think
the HV map corresponds correctly to the ADC channels now. I will
produce an updated map and make another Halog later.
The affected ADC channels were 32-47, which affected PR layer 1 channels 32,33 and PR layer 2 channels 0-13. I verified that the missing channel PR layer 1 channel 32 now has a signal.