keyword=11/7/09 Owl Shift Summary
00:30 Controlled access for LHRS DAQ problem
- BPM, Deadtime issues (see HALOG 297948, 297956)
01:30 Finished controlled access -- problem UNSOLVED
Moving back to beam permit - I = 5 uA
- See HALOG 297975
01:40 VDC voltages turned off, tune beam coming to Hall
01:55 I = 5 uA beam coming to Hall
02:15 Move to I = ~ 110 uA
02:30 HV of PC changed to minimize charge asymmetry
- See HALOG 297979
02:45 Unstable beam from MCC for the past 30 mins.; starting to
stabilize
03:00 Continue runplan with boiling test
04:01 Target fan speed changed to 38 Hz
- See HALOG 297998
04:36 Target fan speed changed to 50 Hz
- See HALOG 298006
05:30 MCC having trouble delivering steady beam for past ~5 mins.
05:55 Moving to controlled access: D. Wang is going back
into the Hall to try to figure out the LHRS DAQ problem (still
persisting from before)
06:35 Problem solved -- retiming module has a loose connection
Request for beam permit
- See HALOG 298038
07:27 Boiling test, varying fan speed progress (complete)
- See HALOG 298044
07:45 Target moved to Optics to take Optics runs