    User name R. Michaels

    Log entry time 14:05:31 on November 07, 2009

    Entry number 298078

    keyword=status

    During today's access a number of problems on the PVDIS trigger/DAQ were
    addressed. Ramesh or someone will post details later. Some logic signals
    were swapped on L-HRS. To adjust timing we had to scrounge 18 cables
    of ~110 nsec length. Found them in Physics storage bldg. Also numerous
    small problems were fixed. If lucky, we may be in production tonight
    or at least tomorrow.

    We're coming out of the hall in a few minutes. The hope is to get a
    shot of beam to study the PVDIS trigger before Compton tuning.
    The Compton is scheduled for 3 pm.