NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 19:21:38 on November 07, 2009
Entry number 298181
This entry is a followup to: 298162
Followups:
keyword=Beam Position Survey
Trigger rate VS beam position scan is planned, as an attempt of
locating LD2 cell centers. This survey starts from solid hole targets
18:10 5uA Beam on carbon hole target
- run 25317/4846
- L/R HRS T1/kHz : 0.98/0.37
- Hole centered
18:17 5uA Beam on dummy with hole, VDC HV ramping up
- run : 25318/4847; 25319 with VDC ON
- L/R HRS T1/kHz : 3.2/1.0
- Hole centered on downstream foil.
18:17 2.1uA Beam on LD2 target
- run : 25320/4848
- L/R HRS T1/kHz : 8.3/3.7
- Hole centered??
18:17 2uA Beam on LD2 target. run : 25321-25322/4849-4850;
VDC ON
- 2.10uA, BPM A = B = (-3.0, 2.0)mm -> L/R HRS T1/kHz :
8.3/3.7
- 2.10uA, BPM A = B = (-3.0, 0.2)mm -> L/R HRS T1/kHz :
8.2/3.7
- 2.07uA, BPM A = B = (-3.0, -2.0)mm -> L/R HRS T1/kHz :
8.0/3.7
- 2.08uA, BPM A = B = (-3.0, -3.0)mm -> L/R HRS T1/kHz :
7.9/3.6
- 2.10uA, BPM A = B = (-3.0, -4.0)mm -> L/R HRS T1/kHz :
7.9/3.7
- 2.12uA, BPM A = B = (-3.0, -4.3)mm -> L/R HRS T1/kHz :
8.0/3.7
- 2.12uA, BPM A = B = (-3.0, -4.3)mm -> L/R HRS T1/kHz :
8.0/3.7
- 2.12uA, BPM A = B = (-3.0, -5.0)mm -> L/R HRS T1/kHz :
???/4.2 -> Start
run 25323/4851.
LHRS Q1 Dipole; RHRS Q1/Q3 tripped. Test suspended.
Cell wall was reached after moving beam Y by 7mm downward
from nominal position. (to (-3.0, -5.0)mm)
A copy of this log entry has been emailed to: xiaochao