• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Jin Huang

    Log entry time 23:40:36 on November 08, 2009

    Entry number 298453

    keyword=Bull's eye scan : Final Segment

    Bull's eye scan

    Scan BPM positions to calibrate ADC BPM readings VS EPICS BPM readings

    Scan Log

    1. One run at the nominal beam center . Done by Vince
    2. One run at (x,y) of both BPM A and B at (+3.0, +3.0). Done by Vince
    3. One run at (x,y) of both BPM A and B at (+3.0, -3.0). Done by Vince
    4. One run at (x,y) of both BPM A and B at (-3.0, -3.0): BPM A =  (-3.0 -1.0); B = (-6.0 -1.0): 25336/4876
    5. One run at (x,y) of both BPM A and B at (-3.0, +3.0):   BPM A =  (-3.0 5.0); B = (-6.0 5.0): 25337/4877
    6. One reference run at the nominal beam center, collaborate HRS test runs, taking T1 instead of T8 @ 5uA carbon target: BPM A =  B = (-3.0 2.0) : 25339/4879
    7. End of Bull's eye scan


    A copy of this log entry has been emailed to: vasulk@jlab.org